-
Project Name:
SAUDI ARABIA 2030 EXPO 132/13.8kV PREFABRICATED SUBSTATION
-
Project Time:
2024
Project Introduction:
SAUDI ARABIA 2030 EXPO 132/13.8kV Prefabricated Substation
SAUDI ARABIA 2030 EXPO 132/13.8kV Prefabricated Substation