STATE GRID JINING JINCUN 110KV PREFABRICATED SUBSTATION
This project took only 75 days from design, production, installation, commissioning, power transmission, and achieved the fastest construction record for a substation of the same scale and standard as State Grid. The temperature operation during the construction process is reduced by 80%, the mechanization utilization rate of the entire process is not less than 95%, and the construction period is shortened by 80%.