-
Project Name:
CHINA DATANG 220/35KV LEMEN STEP-UP OFF-SHORE PREFABRICATED SUBSTATION
-
Project Time:
2020
Project Introduction:
The project is located near the Lemen Islands in the southern sea area of Nan'ao County, Shantou City, Guangdong Province. The total installed capacity is 245 MW, with 35 7.0MW Shanghai Electric SWT7.0-154 wind turbines installed, and a supporting construction of the Teruide 220kV offshore rising voltage station. Prefabricated cabin type offshore booster stations have solved problems such as short construction window periods and complex and changing sea conditions for customers, creating a miracle of offshore wind power construction that starts, builds, and puts into operation in the same year.