-
Project Name:
CHINA HUANENG LHASA ZHAXIGANG 100MW PV PREFABRICATED SUBSTATION
-
Project Time:
2024
Project Introduction:
TGOOD provided high-voltage prefabricated substation, automation equipment substation, grounding transformer prefabricated substation, and smart intergrated kiosk for the project, achieving high-quality delivery of the project. The station adopts a non-metallic outer wall panel+air interlayer form, effectively solving the problem of large temperature differences in high-altitude areas. Ensuring the safe and stable operation of the equipment.