Highlights

Project Name:

CHINA SOUTHERN POWER GRID GUANGZHOU PREFABRICATED POWER DISTRIBUTION

Project Time:

2019

Project Introduction:

The first double decker fully prefabricated distribution room in Guangzhou, meeting the load growth demand of transformer # 1 in Cai Er-3 public transformer room;

Adopting near-zero carbon prefabricated cabin, the high-tech appearance is highly integrated with the surrounding environment;

Equipped with Southern Power Grid V3.0 intelligent digital switching station, it improves the coverage of distribution automation and power supply reliability