Highlights

Project Name:

STATE GRID JINHUA 220KV SUBSTATION EXPANSION

Project Time:

2020

Project Introduction:

Through the construction of prefabricated  substations solution, problems such as tight construction schedules, limited site space, and inability to cut off power to the busbar during construction have been solved. The first 220kV substation of State Grid Corporation of China adopted a prefabricated cabin scheme for expansion.