Highlights

Project Name:

SINOPEC SHUNBEI NO.1 ZONE 110KV PREFABRICATED SUBSTATION

Project Time:

2020

Project Introduction:

The operation of this substation has ended the history of Shunbei Oilfield's lack of grid power supply, providing reliable power guarantee for the commissioning and use of electrical equipment, as well as the subsequent connection of grid drilling motors. After the completion of the project, the Shengdong Natural Gas Power Plant in Shunbei Oil and Gas Field will be decommissioned, saving 25000 to 26000 cubic meters of natural gas per day.